Clause 4.6 Variation Requests
A written request to vary a development standard such as height, FSR or lot size, prepared to the test the courts and councils apply.
Clause 4.6 of the Standard Instrument LEP allows a consent authority to approve development that does not comply with a development standard, provided a written request shows that compliance is unreasonable or unnecessary in the circumstances and that there are sufficient environmental planning grounds for the variation.
A good Clause 4.6 request is not a plea. It is a structured argument that sets out the standard, the extent of the variation with the numbers, the objectives of the standard and the zone, and the specific grounds on which the variation should be supported. URBA prepares these for residential and small commercial DAs across NSW.
Who this is for
- Height of buildings (Clause 4.3)
- Floor space ratio (Clause 4.4)
- Minimum lot size for subdivision and dual occupancy (Clause 4.1 and related)
- Other numerical standards in the LEP
What the report or service includes
- Identification of the standard and the objectives it serves
- Quantified extent of the variation
- Assessment against the tests in Clause 4.6 and the relevant Land and Environment Court decisions
- Environmental planning grounds specific to the site and proposal
- Consistency with zone and standard objectives
- Integration with the SEE and drawings
How it works
Review
We confirm the variation is one that can be supported and its size.
Grounds
We identify the site-specific grounds, not generic ones.
Request
A stand-alone written request in the format councils expect.
Support
We respond to council queries on the request during assessment.
Frequently asked questions
Can a DCP control be varied with Clause 4.6?
No. Clause 4.6 applies to development standards in the LEP. DCP controls are varied on merit within the SEE by addressing the objectives of the control.
How much can a standard be varied?
There is no fixed limit, but the larger the variation the stronger the grounds must be, and variations above ten per cent are usually reported to a planning panel or the elected council rather than determined under delegation.
Where we provide this service
Across Sydney, Western Sydney, the Central Coast, the Hunter, the Illawarra and regional NSW. See the areas we service for council-specific notes, including Blacktown, Penrith, The Hills, Liverpool, Camden and the Central Coast.
Services that often go with this one
Guides related to clause 4.6 variations
Clause 4.6 variations: justifying a height or FSR standard breach
Clause 4.6 variation requests let a NSW DA exceed a height or FSR standard if compliance is unreasonable or unnecessary. How Sydney planners justify…
Dual occupancy in R2 zones across NSW: the July 2024 rule change
On 1 July 2024 dual occupancies became permissible in every NSW R2 zone. What changed, what did not, and how Sydney councils assess duplex…
Get a fixed fee for clause 4.6 variations
Send the address and your plans or concept. A URBA planner will confirm the pathway and send a fixed-fee proposal, usually within one business day.