DA Process & Council

DA refused in NSW? Review of determination or a court appeal (2026 rules)

Council refused your NSW DA? The 2026 review and appeal rules: 6 months to seek a review, local planning panel option, paused appeal clock and fresh DAs.

If a NSW council refuses your development application, you have three realistic options. You can ask for a review of the decision under Division 8.2 of the Environmental Planning and Assessment Act 1979, appeal to the Land and Environment Court under section 8.7, or redesign and lodge a new DA. Since 21 March 2026, after amendments made by the Planning System Reforms Act 2025, you have 6 months to lodge a review and there is no time limit on the council deciding it. Where the council made the original decision, you can choose to have the review decided by the local planning panel. You cannot appeal to the court while a review is underway, but the 6 month appeal clock pauses during the review. For houses, knock-down rebuilds and dual occupancies, the court runs a dedicated residential appeal process under section 34AA of the Land and Environment Court Act 1979. The right choice depends on why the DA was refused and how much the design can change.

Key takeaways

  • From 21 March 2026, an applicant has 6 months to lodge a Division 8.2 review, and the old rule that the review also had to be determined within that period no longer applies.
  • Where the original determination was made by the council, the applicant can elect to have the review determined by the local planning panel, where one is constituted.
  • An appeal cannot be lodged while a review is underway, but the 6 month appeal period is paused during the review so an appeal can still be lodged once it concludes.
  • A review of a modification determination can now also be lodged within 6 months, replacing the former 28 day limit.
  • Appeals about houses and dual occupancies go through the section 34AA residential process: a conciliation conference first, and if there is no agreement the commissioner decides the case straight away.

Who this is for: home owners and small developers in Sydney and regional NSW whose DA for a house, alterations, a granny flat or a duplex has been refused, and who need to choose the right next step under the review and appeal rules in force since March 2026.

Why was the DA refused, and does it matter which option you pick?

It matters more than anything else. Read the notice of determination closely. Every refusal lists reasons, and each reason usually points to a control in the council’s local environmental plan (LEP), its development control plan (DCP) or a matter in section 4.15 of the EP&A Act. Sort the reasons into three groups before you decide anything:

  • Information gaps. The council says it could not be satisfied because a report or plan was missing: a stormwater concept, an arborist report, shadow diagrams, a traffic statement. These are the easiest reasons to overcome, often through a review with the missing material.
  • Design non-compliances. The building breaches a DCP control (setbacks, landscaped area, privacy, overshadowing) or a development standard in the LEP (height, floor space ratio, minimum lot size) without an adequate Clause 4.6 request. Amended plans can fix many of these.
  • Fundamental objections. The use is prohibited in the zone, the site is too small for the proposal, or the council disagrees with the planning merit of the whole scheme. These rarely go away with tweaks, and a review is unlikely to change the outcome.

The common mistake is to respond to a refusal emotionally, filing an appeal on everything when two of the five reasons were simply missing documents. Each reason needs an answer, and the answer determines the pathway.

How does a Division 8.2 review work since March 2026?

Division 8.2 of the EP&A Act lets an applicant ask for the decision to be looked at again. The NSW Department of Planning, Housing and Infrastructure’s information sheet on the second commencement of the Planning System Reforms Act 2025 sets out the changes that took effect on 21 March 2026:

  • an applicant has 6 months to lodge a review, with no time limit on its determination;
  • if the original determination was made by the council, the applicant can elect to have the review determined by the local planning panel, where one is constituted;
  • new regulation-making powers for reviews, and other minor clarifying amendments.

Before these changes, a review had to be both lodged and determined within 6 months, which meant late reviews often failed simply because the council ran out of time. That trap has gone. It is still sensible to lodge early, because the appeal clock is only paused, not reset, and holding costs keep running.

You can lodge amended plans with a review, provided the development is still substantially the same development as the one refused. Amended plans are usually re-notified to neighbours. A fee applies, set under the EP&A Regulation 2021. Reviews are not available for every type of application. Complying development certificates cannot be reviewed this way, and councils’ guidance also excludes designated development, integrated development and Crown applications, so check the council’s current review page before you lodge.

Question Division 8.2 review (from 21 March 2026)
Who decides? A more senior council delegate than the original decision-maker, or the local planning panel if you elect that and the council made the original decision
Can I change the plans? Yes, provided the development remains substantially the same development
Time to lodge 6 months from the determination
Time to decide No statutory deadline
Modification refused? A review can now be lodged within 6 months (previously 28 days)
If it fails Appeal to the Land and Environment Court, with the 6 month appeal period having been paused while the review ran

When is a Land and Environment Court appeal the better option?

An appeal makes sense when the council’s position is unlikely to move on review, or when the reasons for refusal are genuinely contestable on planning merit. The court’s guidance confirms that an applicant may appeal under section 8.7 if dissatisfied with the determination, including a determination on review, generally within 6 months after notice of the determination. Since 21 March 2026, you cannot lodge an appeal while a review is underway, so the choice between the two is a real decision, not something to run in parallel.

For houses and dual occupancies the court uses a specific process. Under section 34AA of the Land and Environment Court Act 1979, residential development appeals cover detached single dwellings, dual occupancies (including their subdivision) and alterations and additions to them. The court must arrange a conciliation conference, run by a commissioner. If the parties reach agreement, the commissioner disposes of the appeal in line with that agreement, provided it is a decision the court could lawfully make. If they do not agree, the commissioner ends the conference and immediately adjudicates. You do not get a fresh hearing in front of a different commissioner or judge.

That structure rewards preparation. Applicants who arrive with amended plans that respond to the council’s contentions often settle at conciliation. Applicants who arrive hoping to argue the original scheme unchanged usually face a decision on the day.

Review, appeal or a fresh DA: which suits your situation?

Situation Usually the better first step
Refused for missing reports or plans Review with the missing material
Refused for two or three DCP non-compliances you can fix Review with amended plans; consider electing the local planning panel
Refused on planning merit you disagree with, design largely right Land and Environment Court appeal
Refused because the scheme needs a substantial redesign Fresh DA (reviews and appeals both require substantially the same development)
Refused because the use is prohibited in the zone None of the three; the land use question has to be resolved first

A fresh DA restarts the fees and the assessment, but it frees you from the “substantially the same” test. Where the honest answer to the refusal is a different building, a new DA with a pre-lodgement meeting is usually faster than forcing a redesign through a review.

The steps we follow after a refusal

  1. Diary the 6 month date from the notice of determination on day one.
  2. Obtain the council’s assessment report so you see the officer’s reasoning, not just the one-line reasons.
  3. Map each reason for refusal to the control or section 4.15 matter it relies on.
  4. Decide which reasons are information gaps, which are fixable design issues and which are fundamental.
  5. Test amended plans against the “substantially the same development” threshold.
  6. Choose the pathway. For a review, decide whether to elect the local planning panel, and lodge with a full statement of reasons and every missing report.
  7. Track the paused appeal clock, so that if the review fails, the appeal is ready to file.

Where applicants lose ground after a refusal

Three patterns come up repeatedly. The first is lodging a review with the same plans and a strongly worded letter. A fresh decision-maker reading the same drawings against the same DCP usually reaches the same answer. The second is changing too much. A review that turns a two storey duplex into a single storey dual occupancy with a different driveway may fail the “substantially the same” test. The third is ignoring the neighbours. If the refusal followed objections, the amended plans will be re-notified and the same neighbours will read them. A short, plain explanation of what changed and why often does more than a technical report.

Definitions

Notice of determination
The written notice a council issues when it approves or refuses a DA, from which review and appeal time limits run.
Division 8.2 review
A request for a DA or modification decision to be reconsidered by a more senior delegate or, at the applicant’s election where the council decided, the local planning panel.
Section 8.7 appeal
An applicant’s appeal to the Land and Environment Court against the determination of a development application.
Section 34AA residential appeal
The court’s process for appeals about detached houses and dual occupancies, starting with a conciliation conference and ending with the commissioner deciding the case if there is no agreement.
Local planning panel
An independent panel that determines certain DAs and, since March 2026, can determine reviews of council decisions where the applicant elects it.

Frequently asked questions

How long do I have to ask for a review of a refused DA in NSW?

Since 21 March 2026, 6 months from the determination, and there is no time limit on the review being decided. Reviews already underway before that date continue under the old rules.

Can I appeal to court while my review is being assessed?

No. An appeal cannot be lodged while a Division 8.2 review is underway, but the 6 month appeal period is paused during the review, so you can still appeal once it concludes.

Can the local planning panel decide my review?

Yes, if the original determination was made by the council and a local planning panel is constituted for the area, you can elect to have the panel determine the review.

Can I change my plans in a review?

Yes, provided the amended development is still substantially the same development as the one refused. Amended plans are usually re-notified.

How long do I have to appeal a refused DA?

Generally 6 months after notice of the determination, with that period paused while a review is underway.

When a DA is refused, we read the assessment report, map each reason to the control behind it and advise whether a review, an appeal or a fresh application gives the best chance, then prepare the amended planning documentation through our DA modifications and RFI responses service. Where the refusal turns on a development standard, a properly argued Clause 4.6 variation request is often the missing piece. If you are inside the 6 month window, request a fee proposal and we will tell you plainly which option we think works.

Information disclaimer. This article is general planning information prepared by the URBA Planning Team and is current at the date of publication. It is not planning, legal or financial advice for any specific property. Planning instruments, development control plans, state policies and the National Construction Code are amended regularly and councils interpret them differently; the controls quoted here should be confirmed against the versions in force at the date of lodgement and against the consent authority’s current requirements. Reliance on this article is at the reader’s own risk. URBA Planning, a division of Contrive Consultants Pty Ltd, accepts no liability for loss arising from its use. For advice on a specific site, contact URBA for a fee proposal.

Next step

Tell us about your site. We will tell you what it can carry.

Send the address and your plans or concept. A URBA planner will confirm the pathway and send a fixed-fee proposal, usually within one business day.