Existing use rights let a lawful use continue after a new planning instrument prohibits it. Under section 4.65 of the Environmental Planning and Assessment Act 1979, an existing use is the use of a building, work or land that was lawfully commenced before the instrument that now prohibits it took effect. The rights run with the land, so a buyer inherits them. They are presumed abandoned if the use stops for a continuous period of 12 months. They can only be enlarged, expanded or altered through a development application, within limits in the Regulation. For investors buying older shops, rural properties or houses in areas that have been rezoned, such as land in the Western Sydney Aerotropolis, existing use rights can protect what is there. They do not give a right to build something new.
Key takeaways
- Existing use rights apply only to uses actually and lawfully commenced before the use became prohibited; a use that was permitted but never started has no existing use rights.
- The rights stay with the land, not the owner, so they pass to a purchaser as long as the use continues.
- An existing use is presumed abandoned if it ceases for a continuous period of 12 months (a temporary COVID-era extension to three years ended on 25 March 2022).
- Changes to an existing use need a DA; exempt and complying development cannot be used, and the Department’s guidance describes limits including that changes be minor and not involve more than a 10 per cent increase in floor space or a significant intensification.
- In the Western Sydney Aerotropolis, some previously permitted uses, such as a dwelling on an existing lot, were reintroduced so that landowners do not have to rely on existing use rights alone.
Who this is for: investors and owners of rural, semi-rural or mixed-use property in Liverpool, Penrith, the Hawkesbury and other areas that have been rezoned, who need to know what an existing use is worth and what they can still do with the land.
What counts as an existing use?
The NSW Department of Planning’s Western Sydney Aerotropolis community guideline gives a clear plain-English explanation of section 4.65: it is the use of a building, work or land that was lawfully commenced under previous planning instruments, such as an LEP, but is now prohibited by another instrument. Three elements have to be proven:
- The use was actually carried out. Not planned, not approved but unbuilt: actually happening on the land.
- It was lawful when it started. Either it had development consent, or it was a use that did not need consent at the time.
- It has continued. No gap of 12 continuous months in which the use stopped.
The guideline is explicit that existing use rights do not apply to a use that was previously permitted with consent but for which no action had been taken to obtain approval. Owning a paddock in a zone where a dwelling used to be permissible is not an existing use of that paddock for a dwelling.
The burden is on the person claiming the rights. Councils will want evidence: the original consent, council records, rates notices, business records, photographs, statutory declarations. Collecting that evidence is the first job when buying a property that relies on existing use rights.
Can existing use rights be lost?
Yes, in three common ways:
| How rights are lost | What it means in practice |
|---|---|
| Abandonment | The use is presumed abandoned if it ceases for a continuous period of 12 months. A shop left vacant for over a year while waiting for a buyer is a classic risk. |
| Change to a different use | Changing to another use without consent can extinguish the original existing use. |
| Unlawful commencement | If the use was never lawful (for example, a second dwelling built without approval), there are no existing use rights to rely on. |
The Department’s guideline notes that during the COVID-19 pandemic the abandonment period was temporarily extended from 12 months to three years, from 25 March 2020, reverting to 12 months on 25 March 2022. Any assessment of continuity today should use the 12 month rule.
Can you expand or alter an existing use?
Sometimes, but only with development consent. Section 4.67 of the EP&A Act allows the Regulation to provide for alterations, extensions, enlargement, expansion and intensification of existing uses. The Department’s guideline summarises the limitations it describes: changes must be minor, cannot involve a more than 10 per cent increase in floor space, and cannot significantly intensify the existing use. It also confirms that an existing use cannot be amended through exempt or complying development. Check the current Regulation provisions before relying on any specific limit, as they have been remade since the guideline was written.
When a council assesses a DA relying on existing use rights, it still considers the section 4.15 matters. The prohibition in the zone does not apply to the existing use, but the impacts of the change on neighbours, traffic and the character of the area still matter.
What about land in the Western Sydney Aerotropolis?
The Aerotropolis is the clearest recent example. When the Western Sydney Aerotropolis SEPP commenced on 1 October 2020 (its provisions now sit in Chapter 4 of State Environmental Planning Policy (Precincts, Western Parkland City) 2021), rural land around the airport was rezoned to Enterprise, Agribusiness, Mixed Use and Environment and Recreation zones. Houses and rural businesses that were lawful before that date could continue under existing use rights.
Following the Independent Community Commissioner’s recommendations, the Department’s guideline explains that some previously permitted uses were reintroduced as permissible with consent, so that landowners do not need to rely only on existing use rights. The guideline’s indicative table includes dwelling houses and dual occupancies in some zones, subject to considerations such as:
- whether the development would create additional lots (subdividing an Agribusiness lot for several houses will not be supported);
- whether the surrounding land has already been developed under the new zone;
- whether the development is inconsistent with airport safeguarding, for example new noise sensitive development such as houses in future noise affected areas;
- the flooding provisions in the SEPP.
For investors, that means a house on an existing Aerotropolis lot may be replaceable or extendable, but the land is not a residential subdivision opportunity, and the airport noise contours matter.
Due diligence on a property relying on existing use rights
- Confirm the current zoning and that the use is now prohibited (check the Planning Portal spatial viewer and the planning certificate).
- Find the date the prohibiting instrument commenced.
- Obtain evidence the use was lawfully commenced before that date: consents, council records, historical aerial imagery.
- Obtain evidence of continuous use, with no gap of 12 months, up to settlement.
- Check whether the use has changed or been intensified without consent along the way.
- If you plan changes, get advice on what the Regulation allows before you pay a price that assumes them.
Definitions
- Existing use
- A use of land, a building or a work that was lawfully commenced before a planning instrument prohibited it, protected by section 4.65 to 4.70 of the EP&A Act.
- Abandonment
- The loss of existing use rights where the use ceases for a continuous period of 12 months.
- Previously permitted use
- In the Aerotropolis, a use that was permissible under the old zoning and has been reintroduced as permissible with consent, subject to conditions.
- Intensification
- An increase in the scale or impact of a use, such as more floor space, more customers or longer hours, which the Regulation limits for existing uses.
Frequently asked questions
Do existing use rights transfer to a new owner?
Yes. Existing use rights stay with the land, not the owner. A buyer can continue the use, provided it has not been abandoned and continues lawfully.
How long can a property be vacant before existing use rights are lost?
An existing use is presumed abandoned if it stops for a continuous period of 12 months. The temporary COVID-era three year period ended on 25 March 2022.
Can I use a CDC to extend a building with existing use rights?
No. Changes to an existing use can only be made through a development application, within the limits in the Regulation.
Can I build a new house on Aerotropolis land?
In some zones a dwelling on an existing lot has been reintroduced as permissible with consent, subject to airport safeguarding, flooding and other considerations. Subdivision for additional dwellings is not supported.
Existing use rights cases turn on evidence and on a careful reading of the Regulation, and we prepare both the history and the planning assessment for DAs that rely on them, as part of our development due diligence and Statement of Environmental Effects services. If you are buying or developing rezoned land in Liverpool, Penrith or anywhere in NSW, request a fee proposal.
Sources and references
- NSW Department of Planning, Industry and Environment, Western Sydney Aerotropolis Community Guideline: Existing use rights and previously permissible land uses (October 2021), accessed October 2026
- Environmental Planning and Assessment Act 1979, sections 4.65 to 4.70 Existing uses, accessed October 2026
- State Environmental Planning Policy (Precincts, Western Parkland City) 2021, Chapter 4 Western Sydney Aerotropolis, accessed October 2026
- NSW Department of Planning, SEPP Precincts 2021 fact sheet, accessed October 2026
- NSW Planning Portal, Spatial viewer, accessed October 2026
Information disclaimer. This article is general planning information prepared by the URBA Planning Team and is current at the date of publication. It is not planning, legal or financial advice for any specific property. Planning instruments, development control plans, state policies and the National Construction Code are amended regularly and councils interpret them differently; the controls quoted here should be confirmed against the versions in force at the date of lodgement and against the consent authority’s current requirements. Reliance on this article is at the reader’s own risk. URBA Planning, a division of Contrive Consultants Pty Ltd, accepts no liability for loss arising from its use. For advice on a specific site, contact URBA for a fee proposal.