Section 4.55 modifications in 2026: 14-day approvals and reviews
Section 4.55 modifications in NSW after the 2026 reforms: the new no impact 4.55(1) pathway, 14-day deemed approval, 6-month reviews and DCA referrals.
Which approval route is fastest and safest for your site, with a written planning advice you can give to your designer and builder.
Complying development (CDC) through a private certifier can be approved in weeks; a development application with council can take months. But CDC only works when the site and design meet every standard in the relevant code, and a failed CDC attempt costs time and design fees.
URBA provides short written planning advices that set out the pathway options for your site, the standards that decide eligibility, the documents required and the likely timeframe. For DAs we prepare for and attend pre-lodgement meetings with council.
Address and what you want to build.
Mapping, exclusions, code standards, LEP and DCP.
Usually within two to three business days.
CDC documentation support or DA preparation.
Complying development has no merit assessment. If a single standard is not met, such as a setback, a floor area or an excluded land mapping, the certifier cannot issue the certificate. A DA is then the route.
For dual occupancies, townhouses and anything with a variation, usually yes. Council feedback before lodgement is far cheaper than a request for information or a refusal after it.
Across Sydney, Western Sydney, the Central Coast, the Hunter, the Illawarra and regional NSW. See the areas we service for council-specific notes, including Blacktown, Penrith, The Hills, Liverpool, Camden and the Central Coast.
Section 4.55 modifications in NSW after the 2026 reforms: the new no impact 4.55(1) pathway, 14-day deemed approval, 6-month reviews and DCA referrals.
How long a DA takes in NSW in 2026-27: 40 and 60 day deemed refusal clocks, DCA referrals since 1 July 2026, and realistic…
How NSW local planning panels work after the 2026 reforms: referral triggers, regionally significant DAs in Sydney and panel reviews of staff decisions.
Send the address and your plans or concept. A URBA planner will confirm the pathway and send a fixed-fee proposal, usually within one business day.