Converting a garage to a granny flat or living space in NSW
Turning a garage into a granny flat or habitable room in NSW? The Class 10a to Class 1a upgrade, approval pathway, BASIX, parking and…
Plain-English explainers on Statements of Environmental Effects, DA and CDC pathways, duplex and granny flat rules, due diligence and the controls of specific councils across Sydney and regional NSW.
Turning a garage into a granny flat or habitable room in NSW? The Class 10a to Class 1a upgrade, approval pathway, BASIX, parking and…
Working from home in NSW? When a home occupation, home business or B&B is exempt or complying development, the 2 employee limit, signage and…
Since 15 December 2025, NSW councils assess the significant likely impacts of a DA under section 4.15. What that means for SEEs, objections, RFIs…
What buyers must check on the Hawkesbury floodplain: LEP 2012 clauses 5.21, 4.2A and 4.2B, the 1:100 ARI flood level, 10.7 certificate flags and…
Builders: the drawing set, survey, BASIX and reports a town planner needs to write an SEE that avoids a council RFI, by development type…
Battle-axe lot rules in NSW: access handle widths, why the handle is excluded from lot area, driveway and bin rules in Sydney DCPs, and…
Central Coast LEP 2022 clause 4.1 lot sizes, clause 4.2B dwelling rights and the DCP 2022 sewer, bushfire and access tests for splitting rural…
What Campbelltown LEP 2015 and the Sustainable City DCP 2015 require for townhouses in R3 zones: FSR, two storey limit, open space, parking, solar…
Buying a Camden growth area lot? The Precincts SEPP, the Camden Growth Centre Precincts DCP lot width tables and what 300 to 450 sqm…
Fairfield LEP 2013 clauses 5.21 and 5.22 and the City Wide DCP flood rules for a new house on a flood control lot: floor…
How Hornsby Shire Council assesses tree removal with a new house DA: Hornsby LEP 2013, Hornsby DCP 2024 tree controls, arborist reports and AS…
Owner builder guide to bushfire prone land in Wollondilly (Wilton, Picton, Tahmoor): PBP 2019, BAL assessment, AS 3959:2018, LEP 2011 and DCP 2016 rules.
Send the address and your plans or concept. A URBA planner will confirm the pathway and send a fixed-fee proposal, usually within one business day.