A new backyard swimming pool in NSW needs approval: either a complying development certificate (CDC) under the Housing Code in the Codes SEPP, or a development application to the council. Penrith City Council notes a fine of $1,500 for a pool of 2,000 litres or more installed without development consent. Under the CDC pathway the pool must be for private use, associated with a dwelling house, behind the building line, and its waterline must be at least 1 metre from a side or rear boundary (clause 3.28 of the Housing Code). Once built, every pool or spa 30 centimetres or deeper must be registered on the NSW Swimming Pool Register and fenced to the Australian Standard. When you sell or lease, the Swimming Pools Act 1992 requires a pool certificate. A buyer who accepts a certificate of non-compliance has 90 days after settlement to fix the barrier.

Key takeaways

  • A private pool can be complying development if it meets the Housing Code standards, including a waterline at least 1 metre from side and rear boundaries and a location behind the building line; otherwise a DA is needed.
  • Pools and spas 30 centimetres or deeper, including portable and inflatable pools, must be registered and surrounded by a compliant barrier.
  • A certificate of compliance is valid for 3 years; councils charge capped inspection fees of $150 for the first inspection and $100 for re-inspections.
  • Since 29 April 2016, a property with a pool cannot be sold without a certificate of compliance, a relevant occupation certificate or a certificate of non-compliance, and cannot be leased without a certificate of compliance or occupation certificate.
  • On a sale with a certificate of non-compliance, the purchaser has 90 days from settlement to make the barrier compliant and obtain a certificate of compliance.

Who this is for: home owners planning a pool in Western Sydney, the Hills, the Central Coast or regional NSW, and buyers and sellers of homes with pools who need to understand the approval and certificate rules before contracts are exchanged.

Does a backyard pool need approval in NSW?

Yes. A permanent in-ground or above-ground pool is not exempt development. The NSW Planning Portal’s complying development page for swimming pools explains that a pool may be done as complying development if it meets the development standards, and points to clause 3.28 of the Housing Code in State Environmental Planning Policy (Exempt and Complying Development Codes) 2008. The headline standards are:

Housing Code standard Requirement
Use Private use, associated with a dwelling house
Location Behind the building line
Setback Waterline at least 1 metre from a side or rear boundary
Heritage Generally not available in a heritage conservation area, on a heritage item or on land with an interim heritage order, subject to limited exceptions
Bushfire and flood Available on bushfire prone and flood-prone lots, subject to the relevant code requirements
Building standards Structurally adequate, installed to manufacturer’s specifications, compliant with the Building Code of Australia

A DA is the pathway where the pool cannot meet those standards, for example where a pool on a narrow lot needs to sit closer to a boundary, where the land is in a heritage conservation area, or where significant excavation or retaining is involved. In a DA the council also considers privacy, noise from the pump and filter, drainage of backwash water and tree impacts. The common mistake is designing the pool and the retaining walls separately. Retaining walls over 600 millimetres need their own approval, and they are best approved with the pool.

What does the pool barrier need to achieve?

The barrier standard is set by the Swimming Pools Act 1992 and its Regulation, which call up Australian Standard AS 1926.1. Penrith City Council’s pool safety page summarises the key dimensions that inspectors check:

  • internal barriers at least 1,200 millimetres high, and barriers on a boundary at least 1,800 millimetres high;
  • gaps under or within the barrier no more than 100 millimetres;
  • gates that self-close and self-latch;
  • climbable objects kept at least 900 millimetres away from the barrier;
  • a CPR sign, dated after 31 August 2018, clearly visible within 3 metres of the pool.

Hornsby Shire Council notes that AS 1926.1-2012 has applied since 1 May 2013, and Penrith advises that the updated AS 1926.1-2024 is expected to apply by 1 May 2027. If you are building now, ask your certifier which edition your pool will be assessed against. Where the pool fence is also the boundary fence, the Dividing Fences Act 1991 cost-sharing rules do not apply in the usual way, so the pool owner should expect to bear that cost.

What do you need when selling or leasing a home with a pool?

Since 29 April 2016 the rules have been tied to the NSW Swimming Pool Register. Hornsby Shire Council and Blacktown City Council summarise them:

Transaction Certificate required
Sale Certificate of compliance, a relevant occupation certificate, or a certificate of non-compliance, attached to the contract
Lease Certificate of compliance or a relevant occupation certificate (a non-compliance certificate is not enough)
Properties with more than two dwellings Exempt from these sale and lease requirements; covered by mandatory three-yearly inspection programs instead

A certificate of compliance is valid for 3 years. Penrith notes that an occupation certificate issued within the past 3 years can act as a certificate of compliance. Certificates can be issued by the council or a private building certifier, and inspection fees are capped: $150 for the first inspection and $100 for re-inspections. Registration on the NSW Swimming Pool Register is the owner’s responsibility, and Penrith lists a $220 fine for an unregistered pool.

Buying with a certificate of non-compliance: the 90 day rule

If you buy a property sold with a certificate of non-compliance, the obligation transfers. Hornsby’s guidance is that the purchaser has 90 days from the date of settlement to rectify all non-compliances and obtain a certificate of compliance, or face penalties. Some councils note exceptions: where the certificate records a significant risk to public safety, or where the property is already subject to a council notice, the timeframe can be shorter.

For buyers, that is a cost to price before exchange. A failed barrier can be a $300 gate latch or a new boundary fence and a relocated pool pump. Ask for the non-compliance certificate and the inspector’s list of defects, get a quote, and negotiate accordingly.

The pool project in order

  1. Check the section 10.7 planning certificate for zoning, heritage, bushfire and flood status, and whether complying development applies.
  2. Survey the yard with levels, the house, boundaries, easements and sewer lines.
  3. Locate the pool behind the building line with the waterline at least 1 metre from side and rear boundaries if you want a CDC.
  4. Design the barrier, retaining walls and pump location at the same time as the pool.
  5. Obtain the CDC from a certifier, or lodge a DA with a Statement of Environmental Effects if the standards cannot be met.
  6. Arrange Sydney Water building plan approval where the pool is near a sewer main.
  7. Build, have the barrier inspected, and obtain the occupation certificate.
  8. Register the pool on the NSW Swimming Pool Register and display the CPR sign.

Definitions

Certificate of compliance
A certificate issued after inspection confirming the pool barrier complies with the Swimming Pools Act 1992, valid for 3 years.
Certificate of non-compliance
A certificate recording that the barrier does not comply and listing the defects; it allows a sale but not a lease.
NSW Swimming Pool Register
The state register on which every pool and spa 30 centimetres or deeper must be recorded by its owner.
AS 1926.1
The Australian Standard for swimming pool safety barriers, called up by the NSW pool legislation.
Waterline
The edge of the water in the pool, from which the 1 metre side and rear boundary setback is measured under the Housing Code.

Frequently asked questions

Do I need a DA for a pool in NSW?

Not necessarily. Many pools can be approved as complying development by a certifier if they meet the Housing Code standards. If they do not, a DA to the council is needed. Either way, a pool needs approval.

How close to the boundary can a pool be?

Under the complying development pathway, the waterline must be at least 1 metre from a side or rear boundary. Closer setbacks need a DA and depend on the council’s controls.

Can I sell my house if the pool fence doesn’t comply?

Yes, with a certificate of non-compliance attached to the contract. The buyer then has 90 days from settlement to fix the barrier and obtain a certificate of compliance.

Do inflatable pools need a fence?

Yes, if they can hold 30 centimetres or more of water. Penrith City Council’s guidance is that portable and inflatable pools of that depth need a compliant barrier and registration.

Most pools go through as complying development, but where yours needs a DA, because of heritage, a tight lot or significant retaining, we prepare the Statement of Environmental Effects and advise on the pathway through our DA or CDC pathway advice. For a pool in Penrith, Hornsby or anywhere in NSW, request a fee proposal.

Information disclaimer. This article is general planning information prepared by the URBA Planning Team and is current at the date of publication. It is not planning, legal or financial advice for any specific property. Planning instruments, development control plans, state policies and the National Construction Code are amended regularly and councils interpret them differently; the controls quoted here should be confirmed against the versions in force at the date of lodgement and against the consent authority’s current requirements. Reliance on this article is at the reader’s own risk. URBA Planning, a division of Contrive Consultants Pty Ltd, accepts no liability for loss arising from its use. For advice on a specific site, contact URBA for a fee proposal.

Next step

Tell us about your site. We will tell you what it can carry.