Knock-down rebuild in Blacktown: LEP 2015 and DCP 2015 controls
Knock-down rebuild in Blacktown: LEP 2015 height, FSR and flood clauses, DCP 2015 Part C setbacks, cut and fill and stormwater rules for the…
9 min read
Read
Knock-down rebuild in Blacktown: LEP 2015 height, FSR and flood clauses, DCP 2015 Part C setbacks, cut and fill and stormwater rules for the…
The Blacktown LEP 2015 and DCP 2015 controls that decide a duplex DA: lot size, frontage, landscaping, stormwater and the station catchments.
Send the address and your plans or concept. A URBA planner will confirm the pathway and send a fixed-fee proposal, usually within one business day.