First duplex in Penrith: LEP 2010 lot sizes and Torrens subdivision
First duplex in Penrith: LEP 2010 clause 4.1A lot sizes, clause 4.1B subdivision widths, DCP 2014 D2 controls and whether Torrens titles are possible.
9 min read
Read
First duplex in Penrith: LEP 2010 clause 4.1A lot sizes, clause 4.1B subdivision widths, DCP 2014 D2 controls and whether Torrens titles are possible.
Georges River LEP 2021 dual occupancy rules: 650 sqm and 15 m lots, 300 or 430 sqm Torrens lots, foreshore scenic protection and DCP…
Dual occupancy in Canterbury-Bankstown: LEP 2023 clause 4.1A lot sizes in Area 1 and Area 2, Torrens lots of 250 and 350 sqm, and…
Send the address and your plans or concept. A URBA planner will confirm the pathway and send a fixed-fee proposal, usually within one business day.