A retaining wall in NSW can be built without approval only if it meets the exempt standards in the Codes SEPP, which councils summarise as no higher than 600 millimetres above existing ground and at least 1 metre from any property boundary, with tiered walls separated by at least 2 metres. Anything higher, or closer to the boundary, needs complying development or a development application, and usually an engineer. Who pays is a separate question. Under the Dividing Fences Act 1991, neighbours generally share the cost of a sufficient dividing fence, and that cost can include a retaining wall that supports the fence, but a retaining wall that simply holds up one owner’s land is generally that owner’s responsibility. Getting the approval and the cost conversation right before work starts avoids most boundary disputes.
Key takeaways
- Exempt retaining walls are limited to 600 millimetres in height and must be at least 1 metre from any boundary; walls separated by at least 2 metres can be tiered.
- Earthworks and structural supports over 600 millimetres can be complying development under Schedule 9 of the Codes SEPP where complying development applies to the land; otherwise a DA is needed.
- The combined height of a retaining wall and the fence on top of it counts against the exempt fence height of 1.8 metres on side and rear boundaries.
- Neighbours generally share the cost of a sufficient dividing fence equally, including building or replacing a retaining wall that supports or maintains the fence.
- If neighbours cannot agree, either can serve a fencing notice, and after one month either can apply to the Local Court or NCAT for fencing orders.
Who this is for: home owners on sloping blocks in the Hills, Wollondilly, the Central Coast, the Illawarra and anywhere else in NSW who are planning a retaining wall, a new boundary fence or both, and want to know what needs approval and how costs are shared with the neighbour.
When does a retaining wall need council approval?
Wollondilly Shire Council’s retaining wall fact sheet (June 2024) gives a clear summary of the exempt standards in State Environmental Planning Policy (Exempt and Complying Development Codes) 2008: the wall must be no higher than 600 millimetres above existing ground and at least 1 metre from any property boundary, and tiered walls can be built where each tier is separated from the next by at least 2 metres. The NSW Planning Portal adds further exempt conditions for earthworks and retaining walls: the works must be at least 40 metres from a natural waterbody, must not redirect surface or ground water or carry sediment onto an adjoining property, and cannot be carried out on a heritage item or draft heritage item. In a heritage conservation area, exempt earthworks must be in the rear yard.
| Wall | Likely approval pathway |
|---|---|
| Up to 600 mm, at least 1 m from every boundary, all exempt standards met | Exempt, no approval |
| Over 600 mm, on land where complying development applies, meeting Schedule 9 standards | Complying development certificate from a council or registered certifier |
| On or close to a boundary, over 600 mm, or on land excluded from complying development | Development application to the council |
| Part of a new house, duplex or pool | Approved with that DA or CDC, shown on the plans |
The Planning Portal confirms that earthworks and structural supports exceeding 600 millimetres above or below ground level may be done as complying development, with the standards in Schedule 9 of the Codes SEPP. Whether complying development is available depends on the land, so check the section 10.7 planning certificate first.
What will the council look at in a retaining wall DA?
For walls on or near a boundary, the council’s main concerns are structural adequacy, drainage, privacy and the neighbour’s amenity. Expect to provide:
- a survey with existing and proposed levels, and the boundary location;
- engineering design for the wall, including footings and drainage behind it;
- a stormwater plan showing where the water collected behind the wall goes;
- details of any fence or screen on top and the combined height;
- an assessment of overlooking where fill raises a yard above the neighbour’s.
Fill is the issue neighbours notice. Raising a rear yard by a metre next to a boundary can put people standing on a lawn at eye level with the neighbour’s living room. Most DCPs limit cut and fill and require privacy measures where filled areas are close to boundaries, and the Statement of Environmental Effects should deal with it directly.
Who pays for a dividing fence in NSW?
Legal Aid NSW explains the rules under the Dividing Fences Act 1991. Neighbours generally share the cost of a sufficient dividing fence equally. What is “sufficient” depends on the existing fence, how the land is used, privacy, local fencing styles, council rules and whether the fence also encloses a pool. Costs are not shared equally where:
- one neighbour wants a fence of a higher standard than sufficient, in which case they pay the extra;
- an owner or occupier damaged or destroyed the original fence;
- one neighbour agrees to pay the full cost;
- the neighbour is a public authority, such as the council;
- the dividing fence is also part of a swimming pool barrier;
- the work was done without agreement or a fencing order, unless it was urgent.
If you cannot agree, either neighbour can serve a fencing notice. If there is still no agreement after a month, either can apply to the Local Court or the NSW Civil and Administrative Tribunal for fencing orders. Building first and sending the invoice later is the classic mistake: without agreement or an order, you may not be able to recover half the cost.
Where do retaining walls fit in the Dividing Fences Act?
The Act’s definition of a fence includes any foundation or support necessary for the support and maintenance of the fence, but it does not include a retaining wall other than in that sense. Wollondilly’s fact sheet sets this out, and Legal Aid NSW lists building, fixing or replacing a retaining wall that supports or maintains the fence among the costs that can be shared. In practice:
- A retaining wall built because one owner cut or filled their land to create a level yard is usually that owner’s responsibility.
- A retaining wall that exists to hold up the boundary fence can form part of the shared fencing work.
- Where all of the wall is within one property, the fence on the boundary is measured on its own; where the wall is on the boundary, the combined height of wall and fence is what counts against the exempt fence limit.
Disputes about failing old walls between properties are common in established suburbs. Get an engineer’s view on why the wall is failing (and whose excavation or fill it supports) before discussing costs.
The order to do things in
- Survey the site with levels and the true boundary. Do not rely on the old fence line.
- Check the planning certificate for zoning, heritage, bushfire and flood status and whether complying development applies.
- Design the wall height and position against the exempt standards first; if it cannot comply, choose CDC or DA early.
- Talk to the neighbour before drawings are final. Agree the fence type and cost split in writing, or serve a fencing notice.
- Obtain the engineering design and the CDC or DA where required.
- Build the drainage behind the wall before backfilling, and keep photographs.
- Build the fence once the wall is complete and certified.
Definitions
- Retaining wall
- A structure that holds back soil where ground levels differ, either within one property or between two properties.
- Dividing fence
- A fence separating the land of adjoining owners, including any foundation or support needed to keep it standing.
- Sufficient dividing fence
- A fence that adequately separates the two properties, judged against the existing fence, land use, privacy, local styles and council rules.
- Fencing notice
- A notice under the Dividing Fences Act 1991 that starts the formal process for agreeing fencing work and costs with a neighbour.
- Schedule 9 of the Codes SEPP
- The complying development standards for excavation, fill, retaining walls, structural support and drainage over 600 millimetres.
Frequently asked questions
How high can a retaining wall be without council approval in NSW?
Up to 600 millimetres above existing ground, at least 1 metre from any boundary and meeting the other exempt standards. Higher walls, or walls on the boundary, need complying development or a DA.
Does my neighbour have to pay half of a retaining wall?
Only where the wall supports or maintains the dividing fence, under the Dividing Fences Act 1991. A wall that holds up one owner’s cut or fill is generally that owner’s cost.
Can I build a fence on top of a retaining wall?
Yes, but the combined height counts. On a boundary, a 600 millimetre wall with a 1.8 metre fence is 2.4 metres and exceeds the exempt fence limit, so it would need approval.
What if my neighbour won’t agree to a new fence?
Serve a fencing notice. If there is no agreement within a month, either of you can apply to the Local Court or NCAT for fencing orders. Mediation through a Community Justice Centre is another option.
Retaining walls and fill near boundaries are one of the most common reasons residential DAs draw objections, and we address them directly in every Statement of Environmental Effects. If you are working out whether your wall fits the exempt rules or needs a DA or CDC, our pathway advice is a quick way to find out. To get started, request a fee proposal. For the wall design and drainage, our sister company Contrive Consultants provides civil and structural engineering.
Sources and references
- Wollondilly Shire Council, Retaining walls fact sheet (June 2024), accessed October 2026
- NSW Planning Portal, Exempt development: earthworks, retaining walls and structural supports, accessed October 2026
- NSW Planning Portal, Complying development: earthworks and structural supports (Codes SEPP Schedule 9), accessed October 2026
- Legal Aid NSW, Fences: your rights and obligations, accessed October 2026
- State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, accessed October 2026
Information disclaimer. This article is general planning information prepared by the URBA Planning Team and is current at the date of publication. It is not planning, legal or financial advice for any specific property. Planning instruments, development control plans, state policies and the National Construction Code are amended regularly and councils interpret them differently; the controls quoted here should be confirmed against the versions in force at the date of lodgement and against the consent authority’s current requirements. Reliance on this article is at the reader’s own risk. URBA Planning, a division of Contrive Consultants Pty Ltd, accepts no liability for loss arising from its use. For advice on a specific site, contact URBA for a fee proposal.